SNC's Dream Chaser Mission Delayed
- Written by Admin TOA
- Published in Technology
Citing delays related to the coronavirus (COVID-19) pandemic, Sierra Nevada Corporation (SNC) has pushed back the time frame for the first mission using its Dream Chaser spaceplane. Formerly scheduled for late 2021, the company now expects the Dream Chaser to make its initial flight to the International Space Station (ISS) in 2022. The cargo mission will be the first of a minimum of six conducted under a Commercial Resupply Services 2 (CRS-2) contract with NASA.
Although it was originally designed as a crewed vehicle, the first Dream Chaser mission will be conducted using the uncrewed cargo version. When paired with SNC’s disposable Shooting Star transfer vehicle, the Dream Chaser cargo system can carry up to 5,500 kg (12,125 pounds) to low-Earth orbit (LEO). Dream Chaser is a reusable lifting-body spacecraft with features including autonomous launch, flight and landing capabilities, folding wings, 1.5 G atmospheric entry and commercial runway landing compatibility. SNC also intends to provide disposal services using the Shooting Star, which is designed to burn up in the Earth’s atmosphere. (By Kate O'Connor - https://www.avweb.com)
Media
Related items
- Ali Koc Buys $14.5 Million Bird Streets Mansion in Los Angeles
- Dream Chaser Space Plane Set to Land as Matchbox Sky Busters Toy
- Meet The Unknown Immigrant Billionaire Betting Her Fortune To Take On Musk In Space
- US Approves King Air 350 ISR Aircraft for Kuwait
- Sierra Nevada Corporation CEO Calls for Advancement of U.S. Leadership in Space Economy
Latest from Admin TOA
- Hiram & Solomon Cigars Introduces the Patriot Cigar Honoring M.W. George F. Hamilton, 91st Grand Master of Masons in Massachusetts
- PCA Officially Announces 2025 Trade Show Dates
- Galaxy Group Gets DO&CO Detroit Project
- Necla Ozkan Joins Coldwell Banker Realty’s 2024 Sterling Society for Outstanding Sales Performance
- "Discovering Hidden Gems: Inspiring Stories from New York Life & Beyond"